{"id":221,"date":"2025-07-20T07:55:22","date_gmt":"2025-07-20T07:55:22","guid":{"rendered":"https:\/\/emerald-engineering.de\/?p=221"},"modified":"2026-03-22T14:01:36","modified_gmt":"2026-03-22T14:01:36","slug":"bim-planung","status":"publish","type":"post","link":"https:\/\/emerald-engineering.de\/en\/bim-planung\/","title":{"rendered":"BIM planning"},"content":{"rendered":"<p>With BIM, we plan your electrical engineering digitally in a 3D model. This means that collisions are detected early on, costs and deadlines can be planned better - and execution on the construction site runs more smoothly.<\/p>\n\n\n\n<p>We understand BIM not just as 3D visualization, but as a consistent methodology across all project phases. We structure our models to provide reliable information \u2013 from planning and tendering to execution and documentation.<\/p>\n\n\n\n<p>A common mistake in practice is using BIM merely as a \"pretty model,\" without a clear structure, defined content, or real added value for the construction site. Often, unambiguous component information, coordinated interfaces, or a uniform standard among the stakeholders are lacking. This results in models existing but not being reliably usable.<\/p>\n\n\n\n<p>This is precisely where we come in. We place great emphasis on a clean model structure, clearly defined information content (LOD\/LOI), and coordinated interfaces with other trades. Our planning is designed to work in practice \u2013 with unambiguous route alignments, traceable dimensioning, and analyzable data for quantities, costs, and operations.<\/p>\n\n\n\n<p>The goal is to create genuine transparency and planning security with BIM \u2013 not only in the model, but above all on the construction site and in later operation.<\/p>","protected":false},"excerpt":{"rendered":"<p>With BIM, we plan your electrical engineering digitally in a 3D model. This means that collisions are detected early on, costs and deadlines can be planned better - and execution on the construction site runs more smoothly.<\/p>","protected":false},"author":2,"featured_media":343,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-221","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/posts\/221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/comments?post=221"}],"version-history":[{"count":3,"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/posts\/221\/revisions"}],"predecessor-version":[{"id":385,"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/posts\/221\/revisions\/385"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/media\/343"}],"wp:attachment":[{"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/media?parent=221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/categories?post=221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/emerald-engineering.de\/en\/wp-json\/wp\/v2\/tags?post=221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}